Közép-Tisza Regional Water Construction and Telecommunications Ltd. (KÖTIVIÉP‘B Kft.) is a 100% Hungarian-owned private company, carrying forward the professional values of Közép-Tisza Regional Water Construction Ltd. (KÖTIVIÉP Kft.).
The restructured company has been operating since January 1, 1998, throughout the entire territory of Hungary. Its construction experience dates back several decades (from the 1960s as part of the Water Management Directorate, from 1994 as KÖTIVIÉP Kft.). With the “apport” of the full technical and execution staff of the market-oriented and efficiently run KÖTIVIÉP Kft., these valuable experiences have been successfully preserved and, with the addition of a tradition-rich new ownership partner, are being developed with even greater momentum.
Thanks to our engineers and specialists with outstanding professional knowledge and experience, the quality of our services fully meets our clients’ expectations. From project preparation to full implementation, we offer our partners comprehensive services. Our company holds all the necessary permits and certifications for the works we carry out, including those recognized and audited by EMT Zrt.: MSZ EN ISO 14001:2015, MSZ ISO 45001:2018, MSZ EN ISO 9001:2015, and we also comply with MSZ EN ISO 50001:2019 requirements.
Our activities cover the construction of sewage, stormwater, and drinking water networks; environmental investments; water and civil engineering structures; reinforced concrete facilities; building structures; hydromechanical and irrigation works—both as a main contractor and a general contractor. We also have our own machinery for dredging riverbeds and canals, stone works, embankment construction, and sheet piling works.
Our projects have been nominated for awards on several occasions, including the Lampl Hugó Award for the flood protection retaining wall and promenade in the inner city of Szolnok, and the Construction Industry Award of Excellence for the first mobile flood protection wall in Szentendre, the Kis-Delta flood retention reservoir, and the flood protection system developments in downtown Szeged. Our firm goal is to preserve the values accumulated over past decades and, by further developing them, to achieve the highest possible operational efficiency.
Our mission is to carry out our tasks at the highest quality, using advanced technologies while keeping environmental and nature conservation aspects in mind, so that our clients and partners remain fully satisfied.
Completed Projects:
- Further Development of the Vásárhelyi Plan, Phase I – Relocation of the Bivaly-tó Flood Protection Levee Section (construction of a new levee, reconstruction of existing and retained sections with forelands on both the protected and unprotected sides), design and execution
- Development and reconstruction of the Körös-ér main drainage channel
- Works at the pumping station located at the 0+000 km section within the Körös-ér main drainage channel reconstruction and development project
- Dredging works on the Harangzugi I. main drainage channel, construction of civil engineering structures
- Dredging works on the Hanyi-ér main drainage channel, construction of under-road culverts and civil engineering structures
- Construction of a retaining wall and primary flood protection line along Sebestyén Boulevard, Szolnok, right bank of the Zagyva River, between sections 0+910 and 1+140 tkm
- Development of hydrological and water quality networks at the 1+667 km and 33+000 km sections within the Körös-ér main drainage channel reconstruction and development project
- Reconstruction works on the Millér main drainage channel; Gyáli Stream, Branch 7, bed regulation works
- Restoration works of bank slip (slope stability) within Szolnok urban area, right bank of the Tisza River, between sections 63+996 and 64+345 tkm (349 m)
- Dredging of 201 km of main drainage channels, formation of spoil areas
- Flood damage prevention investments in Felsőzsolca and surrounding areas
- Flood protection development in Hernádkércs – primary municipal flood protection structure
- Construction works for the expansion and modernization of the wastewater treatment plant in the Veresegyház agglomeration
- Integrated development of main flood protection works in the Hanyi-Tiszasüly flood retention basin impact area
- Development and reconstruction of the main flood protection works in the Kakat drainage basin
- Ecological improvement of the floodplain and protected side water replenishment system in Szigetköz, Part 1
- Ecological improvement of the floodplain and protected side water replenishment system in Szigetköz, Part 2
- Szamos–Kraszna interfluve floodwater retention reservoir
- Strengthening and modification of flood protection structures in Szentendre to protect the historic old town
- Flood protection line development, regional development of Szolnok city along the right-bank flood protection section (10.02 flood protection section)
- Construction of stormwater drainage system in Köztársaság Street, Albertirsa
- Reconstruction of the Csongrád riverbank and enhancement of bed slope stability
- Flood protection line development in the Körös-zug area along the right bank of the Hármas-Körös River
- Development of Berettyó levees in the Kis-sárrét and Berettyóújfalu floodplain basins, Part 1
- High-rise works for the development of Berettyó levees in the Kis-sárrét and Berettyóújfalu floodplain basins, Part 2
- Contract for design and construction works for the “Complex Tisza Lake Project” sub-project “Tisza-Tó” Part 1 (structures)
- Contract for design and construction works for the “Complex Tisza Lake Project” sub-project “Tisza-Tó” Part 2 (dredging)
- Development of the flood protection system along the upper Tisza River and the left bank of the Bodrog in Bodrogköz
- Improvement of flood safety in the right-bank flood protection sub-basin of the Marcal River
- Construction of M30-26 main road, Miskolc northern bypass, Phase II
- Flood protection system development in downtown Szeged
- Restoration of flood safety in Komárom–Almásfüzitő
- Modernization of the Kis-Delta flood emergency reservoir
- Beregi complex flood mitigation and floodplain revitalization
- Main drainage structures on the Nagykunság main channel
- Flood restoration works on the Mosoni Duna
- Development of landscape management infrastructure in Bodrogköz, including the Cigánd flood retention reservoir area – KEOP-2.1.3/11-2013-0001
- Development of Berettyó levees in the Kis-sárrét and Berettyóújfalu floodplain basins
- Restoration of the Zagyva right-bank flood levee and retaining wall between the railway bridge and Dr. Sebestyén Gyula Boulevard bridge
Ongoing Projects:
- Construction of the Böddi-szék bypass channel and associated facilities under the “Restoration of Pannonian saline aquatic habitats in the Kiskunság” project (LIFE12 NAT/HU/001188)
- Flood protection development in Esztergom, Phase I, between sections 0+325 and 1+751 tkm, between the Mária-Valéria Bridge and the Prímás Island ramp, under FIDIC Yellow Book conditions – including detailed and as-built design
- Agricultural production capacity development VP2-4.1.4-16, Part II: Irrigation facility, Kislippó
- Agricultural production capacity development VP2-4.1.4-16, Part I: Irrigation facility, Ormány
Contact details:
- Registered office: 5000 Szolnok, Gáz utca 1.
- Tax number: 11505561-2-16